OPERATIONSOperational priorities
Relevant responsibilities include assessment cycles, technical review, intervention priorities, project scope, contractor assignments, funding approvals, purchasing, and acceptance, with the accountable authority identified for each stage.
INFORMATIONInformation and handoffs
Assessments can connect drawings and field evidence with engineering recommendations, capital plans, project baselines, changes, and intervention results.
EVIDENCEEvidence and context
A durable record identifies the asset, component, location, observation date, method, author, limitations, and applicable review, preserving the context needed to interpret changes over time.
COORDINATIONResponsibilities and follow-through
Asset owners, engineering, project delivery, maintenance, procurement, finance, and contractors may contribute to an intervention, with defined handoffs between assessment, decision, execution, and acceptance.
DECISIONSDecisions and approvals
An intervention decision can preserve the technical basis, alternatives documented by reviewers, authorized scope, approval, assigned work, and verification, while maintaining the distinction between recommendations and decisions.
CONTINUITYContinuity and risk
Condition observations, access constraints, dependencies, and outstanding recommendations can inform qualified review, with the relevant asset, source documents, responsible specialists, and required decisions identified in the record.